Analysis of characteristics affecting completion time for Malaysian construction projects

Author:

Shehu Zayyana,Holt Gary D.,Endut Intan R,Akintoye Akintola

Abstract

Purpose – Construction projects within Malaysia are plagued by time overruns that can transform what should have been successful projects, into those incurring additional costs, disagreements, litigation and in some cases abandonment. To help better understand this problem, the purpose of this paper is to investigate Malaysian project characteristics in relation to time overruns. Design/methodology/approach – In total, 150 Malaysian quantity-surveying organisations provided data relating to recent projects they have worked on. Project characteristics considered in analysis are new build and refurbishment, public and private sectors, procurement methods used, nature of projects and tendering methods. Findings – Public sector projects were found more prone to overruns than those in the private sector; refurbishment projects experienced better time performance than new build; construction management demonstrated better time performance than design-build or traditional procurement; and infrastructure projects/negotiated tendering, performed better than selective/open tendering, respectively. The study also developed a linear model to predict project duration, based on contract period. Research limitations/implications – The study adds a geographically specific detailed analysis to the extant literature of project performance generally and to that of time overruns more specifically. Practical implications – Findings provide stakeholders with information that may help mitigate the frequency of project delays among construction projects, especially in Malaysia. Originality/value – The analysis and modelling of time overrun in relation to Malaysian project characteristics in this way is novel.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Cited by 17 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Examining the Impact of Material Management Practices on Project Performance in the Construction Industry;Buildings;2024-07-07

2. Construction Process Optimization of Concrete Structural Elements Using VDC - Case Study (Building);International Conference on Future Technologies in Manufacturing, Automation, Design and Energy;2023-09-27

3. Cost calculation comparison of wall finishing work on project X between conventional method and BIM method;INTERNATIONAL CONFERENCE ON MECHANICAL MATERIALS AND RENEWABLE ENERGY (ICMMRE 2022);2023

4. Reducing Over-processing Construction Waste by Using Lean Construction Tools in The Malaysian Construction Industry;IOP Conference Series: Earth and Environmental Science;2022-10-01

5. Risk assessment of underground and elevated metro projects from clients' and contractors' perspective;Built Environment Project and Asset Management;2022-05-17

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3