Abstract
In the construction industry, much of the construction process is controlled by materials, and material management has a direct impact on many performance criteria such as cost, time, quality, and efficiency. This study examined the impact on project performance of activities that make up the material management process: planning, supply, logistics, transport, stock, and waste control of building materials. Material management practices were measured using 15 criteria under five different headings, and project performance was measured using 13 criteria under three different headings, through surveys of industry personnel at various construction sites. Multiple regression analyses were performed on the data obtained. The impacts of material management practices on project time, project cost, project efficiency, and waste performance, as well as overall project performance were examined using multiple regression analyses. The analysis showed that material supply, material handling, and stock and waste control had positive impacts on overall project performance, while material planning and material logistics did not have statistically significant impacts. It is concluded that the results of the study will help to better understand the relationship between material management and project performance and will help stakeholders to improve their material management practices.
Reference91 articles.
1. Materials Management Practices in the Construction Industry;Caldas;Pract. Period. Struct. Des. Constr.,2015
2. Relationship between Factors of Construction Resources Affecting Project Cost;Rahman;Mod. Appl. Sci.,2013
3. Barry, W., Leite, F., and O’Brien, W. (2014, January 19–21). Identification of Late Deliverables and Their True Effects on Industrial Construction Projects. Proceedings of the Construction Research Congress 2014: Construction in a Global Network, Atlanta, GA, USA.
4. Most critical factors responsible for poor project quality performance in building construction industry A case study of three major cities in Nigeria;Aiyewalehinmi;Eur. Int. J. Sci. Technol.,2019
5. Supplier selection process in an integrated construction materials management model;Safa;Autom. Constr.,2014