Purpose
The purpose of this study is to gain insight into procurement routes and forms of contract used for volumetric offsite manufacturing (VOSM) in the housing sector of the UK West Midlands. Seminal literature and government reports have established the potential of offsite technologies to improve the supply of quality housing in the UK. However, the lack of a structured procurement route, common to manufacturing approaches in construction, has significantly contributed to delays in large scale adoption.
Design/methodology/approach
To achieve the research intention, an exploratory study was undertaken. A literature review of seminal literature and government papers was conducted to establish and benchmark current trends in context. Data was collected using focus groups and interviews with a housing association and housing VOSMs. Grounded theory was used to analyse data and inductively generate themes leading to an original procurement model. The issues identified in the delivery of volumetric housing were categorised into three themes.
Findings
The findings suggest a limited familiarity with offsite manufacturing (OSM) by housing providers. Albeit, a willingness to adopt these technologies to deliver housing were demonstrated by trial attempts. However, due to limited knowledge, the approach to procurement is by adapting existing procurement models, which are not ideal and obstruct the potential benefits of using offsite technologies primarily because of the significant difference in processes. Also, geographical location influenced procurement decisions when comparing cost with conventional procurement and the dearth of specific government incentives to deliver housing using offsite technologies. This study proposes a procurement model for VOSM.
Practical implications
The results have implications for decisions about procurement routes and contractual terms used by housing providers delivering volumetric offsite manufactured housing at scale. Although this study focussed on the West Midlands region, most of the issues identified were not geographically unique.
Originality/value
This study contributes to the existing body of knowledge on potential barriers to the adoption of OSM in the housing sector of the UK. The findings will be of value to stakeholders involved in delivering housing and offers a useful contextual basis for future research.
Subject
Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering
Reference49 articles.
1. Optimising the use of off-site manufactured components in the UK house-building sector: understanding the legal and contractual issues,2020
2. Improving the collaboration between main contractors and subcontractors within traditional construction procurement;Journal of Construction Engineering,2013
3. Design for manufacture and assembly in offsite construction and relationship with concurrent engineering,2020
4. Analysis of interacting uncertainties in on-site and off-site activities: implications for hybrid construction;International Journal of Project Management,2016
5. Enhancing high-rise residential construction through design for manufacture and assembly – a UK case study;Proceedings of the Institution of Civil Engineers – Management, Procurement and Law,2018
Cited by
17 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献