Managing supply chain risks and delays in construction project

Author:

Panova Yulia,Hilletofth Per

Abstract

Purpose The purpose of this paper is to investigate models and methods for managing supply chain risks and delays in construction projects. Design/methodology/approach The study mainly employs quantitative analysis in order to identify disruptions in construction supply chains. It also uses paradigms of simulation modeling, which are suitable for risk assessment and management. Both qualitative and quantitative data were collected through a literature review and details of specific construction projects, respectively. A dynamic modeling method was used, and the model was provided with an event-based simulation. Simulation modeling was used to measure the performance of the system. Findings The study shows the benefits of applying the dynamic modeling method to a construction project. Using event-based simulation, it was found that construction delays influence both the magnitude and the probability of disruption. This method contributes to the existing theoretical foundations of risk management practices, since it also considers the time factor. This method supplements the Monte Carlo statistical simulation method, which has no time representation. Using empirical analysis, the study proposes increasing the safety stock of construction materials at the distribution center, so as to mitigate risks in the construction supply chain. Research limitations/implications The research considers a single case of a hypothetical construction project. The simulation models represent a simple supply chain with only one supplier. The calculations are based on the current economic scenario, which will of course change over time. Practical implications The outcomes of the study show that the introduction of a safety stock of construction materials at the distribution center can prevent supply chain disruption. Since the consideration of risks at all stages of construction supply chain is essential to investors, entrepreneurs and regulatory bodies, the adoption of new approaches for their management during strategic planning of the investment projects is essential. Originality/value This dynamic modeling method is used in combination with the Monte Carlo simulation, thus, providing an explicit cause-and-effect dependency over time, as well as a distributed value of outcomes.

Publisher

Emerald

Subject

Industrial and Manufacturing Engineering,Strategy and Management,Computer Science Applications,Industrial relations,Management Information Systems

Reference47 articles.

1. MCDA and risk analysis in transport infrastructure appraisals: the Rail Baltica case;Procedia – Social and Behavioral Sciences,2011

2. Combining Monte Carlo simulations and options to manage the risk of real estate portfolios;Journal of Property Investment & Finance,2013

3. Identifying Public-Private Partnership (PPP) risks in managing water supply projects in Ghana;Journal of Facilities Management,2013

4. Sensitivity analysis for property appraisal;Journal of Property Valuation and Investment,1993

Cited by 46 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3