Identifying risks and mitigation strategies in private sector participation (PSP) in power generation projects in Ghana

Author:

Ameyaw Collins,Alfen Hans Wilhelm

Abstract

Purpose The purpose of this paper is to identify the risks associated with private sector participation (PSP) in power generation (PG) projects, how they were allocated and the strategies used to mitigate their likely adverse effects. Design/methodology/approach The paper adopts case study research method and cross-case analyses to unearth the key risks and the contractual instruments used to manage them. Findings The paper identified 30 risk factors associated with four major private sector PG projects in Ghana. The allocation and mitigation strategies of these risks are also reported. Originality/value This is the first study to create a risk register of PSP PG projects. Private investors and government have been provided with a comprehensive list of risks associated with PG infrastructure. Would-be investors have also been armed with some potential risk management strategies for proper project structuring.

Publisher

Emerald

Subject

Management of Technology and Innovation,Strategy and Management,Business and International Management

Reference53 articles.

1. Alfen, H.W., Kalidindi, S.N., Ogunlana, S., Wang, S., Abednego, M.P., Frank-Jungbecker, A., Amber Jan, Y.-C., Ke, Y., Wen Y., Liu, Singh, L.B. and Zhao, G. (2009), Public-Private Partnership in Infrastructure Development: Case Studies from Asia and Europe, Schriftenreihe der Professur Betriebswirtschaftslehre im Bauwesen, Vol. 7, Bauhaus-Universität, Weimar, available at: http://nbnresolving.de/urn:nbn:de:gbv:27-20100922-160114-1

2. Ameyaw, E.E. (2014), “Risk allocation model for public-private partnership water supply projects in Ghana”, Ph.D. thesis, The Hong Kong Polytechnic University, Hong Kong.

3. Identifying public-private partnership (PPP) risks in managing water supply projects in Ghana;Journal of Facilities Management,2013

4. Risk allocation in public-private partnership water supply projects in Ghana;Construction Management and Economics,2015

5. A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects;Journal of Facilities Management,2015

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3