A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects

Author:

Ameyaw Ernest Effah,Chan Albert P.C.,Owusu-Manu De-Graft,Coleman Ekow

Abstract

Purpose – The purpose of this paper is to identify and then evaluate perceived risk factors influencing variability between contract sum and final count, and to develop a fuzzy risk assessment model for evaluating the overall impact of established critical risk factors impacting on variability between contract sum and final account in government-funded construction projects. Construction projects are characterised by risk factors that significantly impact on variability between the contract sum and final account. Design/methodology/approach – A research approach integrating questionnaire survey, mean scoring ranking and principal component factor analysis (PCFA) methods was adopted to evaluate and classify the critical risk factors. A fuzzy synthetic evaluation method was sequentially applied to compute the overall risk impact (ORI) of eight critical risk factors’ impact on variability between contract sum and final account. Findings – Initial results showed that eight critical risk factors have high impact on variations between contract sum and final account, namely (in order): project funding problems, underestimation of quantities, variations by client, change in scope of works, inadequate specification, change in design by client, defects in design and unexpected site (ground) conditions. PCFA produced two factor solutions: “professional-related factors” and “client factors”. The fuzzy model further showed that the ORI is 5.48, indicating that these risk factors have a high impact on variability between contract sum and final account in public construction projects. The client factors have a very high impact (5.59), while the professional-related factors indicated a high impact (5.41) on project cost variability. Originality/value – A practical model is proposed to evaluate the key risks associated with cost overruns in public projects. By giving effective and sustained attention to these factors, variability between contract sum and final account, a common situation in Ghana, can be controlled to achieve cost savings in public infrastructure projects.

Publisher

Emerald

Subject

Management of Technology and Innovation,Strategy and Management,Business and International Management

Cited by 45 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3