Dynamic Bayesian network modelling for predicting adaptability of time performance during time influencing factors disruptions in construction enterprise

Author:

Nwadigo Okechukwu,Naismith Nicola Naismith,Ghaffarianhoseini Ali,Ghaffarian Hoseini Amirhosein,Tookey John

Abstract

PurposeA construction project is complex and requires dynamic modelling of a range of factors that deters time performance because of uncertainty and varying operating conditions. In construction project systems, the system components are the interconnected stages, which are time-dependent. Within the project stages are the activities which are the subsystems of the system components, causing a challenge to the analysis of the complex system. The relationship of construction project time management (CTM) with the construction project time influencing factors (CTFs) and the adaptability of the time-varying system is a key part of project effectiveness. This study explores the relationship between CTM and CTF, including the potentials to add dynamical changes on every project stage.Design/methodology/approachThis study proposed a dynamic Bayesian network (DBN) model to examine the relationship between CTM and CTF. The model investigates the time performance of a construction project that enhances decision-making. First, the paper establishes a model of probabilistic reasoning and directed acrylic graph (DAG). Second, the study tests the dynamic impact (IM) of CTM-CTF on the project stages over a specific time, including the adaptability of time performance during disruptive CTF events. In demonstrating the effectiveness of the model, the authors selected one-organisation-single-location road-improvement project as the case study. Next, the confirmation of the model internal validity relied on conditional probabilities and the project knowledge experts' selected from the case company.FindingsThe study produced structural dependencies of CTM and CTF with probability observations at each stage. A predictive time performance analysis of the model at different scenarios evaluates the adaptability of CTM during CTF uncertain events. The case demonstration of the model application shows that CTFs have effects on CTM strategy, creating the observations to help time performance restorations after disruptions.Research limitations/implicationsAlthough the case company experts' panel confirms the internal validity of the results for managing time, the model used conditional probability table (CPT) and project state values from a project contract. A project-wide application then will require multi-case data and data-mining process for generating the CPTs.Practical implicationsThe study developed a method for evaluating both quantitative and qualitative relationships between CTM and CTF, besides the knowledge to enhance CTM practice and research. In construction, the project team can use model observations to implement time performance restorations after a predictive or reactive disruption, which enhances decision-making.Originality/valueThe model used qualitative and qualitative data of a complex system to generate results, bounded by a range of probability distributions for CTM-CTF interconnections during time performance disruptions and restorations. The research explores the approach that can complement the mental CTM-CTF modeling of the project team. The CTM-CTF relationship model developed in this research is fundamental knowledge for future research, besides the valuable insight into CTF influence on CTM.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference61 articles.

1. Identification and assessment of risk factors affecting construction projects;HBRC Journal,2017

2. Aggregation of factors causing cost overruns and time delays in large public construction projects;Engineering Construction and Architectural Management,2017

3. Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects;Journal of Civil Engineering and Management,2017

4. Analysis of interacting uncertainties in on-site and off-site activities: implications for hybrid construction;International Journal of Project Management,2016

5. Integrated management of on-site, coordination and off-site uncertainty: theorizing risk analysis within a hybrid project setting;International Journal of Project Management,2017

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3