Assessment of preconstruction factors in sustainable project management performance

Author:

Naji Khalid,Gunduz Murat,Salat Fatema

Abstract

PurposeThe construction sector has a global reach, and construction professionals worldwide often encounter challenges in delivering a project on time and within the assigned budget. Hence, this paper aims to investigate the preproject factors that most affect the performance of construction projects.Design/methodology/approachA literature review was conducted to identify these factors from previous research, after which a questionnaire was developed and distributed to construction industry professionals worldwide. The response data were collected and analyzed using several methods, including Cronbach’s alpha, Relative Importance Index (RII), Kruskal–Wallis test, and Spearman’s and Pearson correlations.FindingsThe results highlight four categories of significance, namely design, stakeholder, engineering, and procurement, with 31 factors being assigned to these categories. The relationships between each factor based on the categories established in the survey are then presented. With the help of data analysis, focusing on these significant preproject factors will help management teams to evaluate and improve the preconstruction process to achieve a higher project success rate.Originality/valueThis study differs from other studies in the literature by gathering all relevant preconstruction success factors by an extensive literature review. Finally, highly ranked factors are studied in detail for a better understanding of the impact of preconstruction factors on project performance. This study is supported by powerful tests such as Kruskal–Wallis test and Spearman’s correlation to study the perception of different groups on preconstruction factors. Furthermore, the data analysis will help in identifying and avoiding the failure part of the previous projects and will improve the planning and/or forecasting of the new projects.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference76 articles.

1. Estimating preconstruction services for bridge design projects;Journal of Management in Engineering,2020

2. Factors affecting construction labour productivity for Malaysian residential projects;Structural Survey,2005

3. Development of an on-site builder's estimating app for construction waste reduction,2017

4. Analytic hierarchy of motivating and demotivating factors affecting labor productivity in the construction industry: the case of Azerbaijan;Sustainability,2019

5. The professionals' perspective on the causes of project delay in the construction industry;Engineering, Construction and Architectural Management,2017

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3