1. Adikari, W. (2018), “Potential mitigation strategies for higher transaction cost of PPP context”, unpublished thesis (BSc), University of Moratuwa.
2. Ahamad, M.H.S., Perera, B.A.K.S. and Illankoon, I.M.C.S. (2013), “In house versus outsourcing facilities management: a framework for value added selection in Sri Lankan commercial buildings”, in Senevirathne, L.D.I.P. and Sandanayake, Y.G. (Eds), Proceedings of the Second World Construction Symposium on Planning, Designing and Building for Tomorrow, Ceylon Institute of Builders, Colombo, pp. 298-306.
3. The significance factors causing delay of building construction projects in Malaysia;Engineering, Construction and Architectural Management,2007
4. Risk ranking and analysis in PPP water supply infrastructure projects: an international survey of industry experts;Facilities,2015