Identification of Various Execution Modes and Their Respective Risks for Public–Private Partnership (PPP) Infrastructure Projects

Author:

Akhtar Muhammad1,Mufti Nadeem Ahmad1,Mubin Sajjad2,Saleem Muhammad Qaiser1ORCID,Zahoor Sadaf1,Ullah Sanna3ORCID

Affiliation:

1. Faculty of Mechanical Engineering, Department of Industrial & Manufacturing Engineering, University of Engineering & Technology, Lahore 54890, Pakistan

2. Faculty of Civil Engineering, Department of Architectural Engineering and Design, University of Engineering & Technology, Lahore 54890, Pakistan

3. Faculty of Management Sciences, University of Central Punjab, Lahore 54782, Pakistan

Abstract

The public–private partnership (PPP) based model for the execution of infrastructure projects originated from Anglo-Saxon countries and was initially used in 1977 by the United Kingdom (U.K). Since then, its popularity has increased worldwide. Earlier studies by researchers and many other professional sectors and departments have introduced PPP contracts into different execution modes like Build, Operate, and Transfer (BOT); Build, Own, Operate, and Transfer (BOOT); and Build, Lease, and Transfer (BLT), etc. All definitions of PPP contracts are different but have a few common characteristics and risks. Previously, numerous pieces of literature were available on these common risks for various execution modes of PPP contracts. However, each PPP mode still has unique risks that must be identified to understand and successfully implement the PPP projects properly. This paper fills the gap mentioned above and aims to identify various commonly used PPP execution modes in infrastructure projects and their corresponding risks after placing the different PPP execution modes into four (04) different categories. Identified risks for the corresponding PPP categories were also divided into seven (07) stages of the PPP life cycle. Semi-structured interviews were conducted to gather information from thirty-four (34) PPP experts worldwide. Accordingly, interviews are transcribed and processed for thematic analysis in academic NVIVO software. These identified risks are further placed in the respective PPP category for the convenience and better understanding of the study’s outcome to the users and for the subsequent prioritization and allocation of these identified risks accordingly to the PPP parties during the finalization of the PPP execution mode.

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3