Author:
Moradi Mojtaba,Hafezalkotob Ashkan,Ghezavati Vahidreza
Abstract
Purpose
This study considers a project scheduling model to assess the project risks and the impacts on project sustainability when subcontractors collaborate under uncertainty. Moreover, some allocation methods are applied for fair allocating utility of the project and supper-additivity, stability and satisfaction level of each coalition. Finally, sustainability concept is considered in risk assessment in all coalitions.
Design/methodology/approach
The proposed mathematical programming model evaluates project risks when the subcontractors cooperate with each other by sharing their limited resources. Then, some cooperative game theory methods are applied for fair allocation of net present value, of the cooperation and finally sustainability aspects (economic, social and environmental) are investigated in risk assessment for each possible coalition.
Finding
The results of the proposed model indicate that the subcontractors can increase their profit by 10 per cent ($14,028,450 thousand) and save the equilibrium between sustainability aspects especially in grand coalition. It means that subcontractors do not have incentive to leave the coalition and the supper-additive property is feasible. Furthermore, risk assessment shows that project risks have less impact on subcontractor profits when they cooperate with each other.
Originality/value
Sustainability aspects may be investigated in project management in previous studies, but the authors study sustainability indicators when subcontractors form a coalition and share their resources in response to the risks of availability to resources and delay in completing the project under uncertainty.
Subject
Computer Science (miscellaneous),Social Sciences (miscellaneous),Theoretical Computer Science,Control and Systems Engineering,Engineering (miscellaneous)
Reference53 articles.
1. A TOPSIS extension framework for re-conceptualizing sustainability measurement;Kybernetes,2016
2. Nash equilibria for the multi-agent project scheduling problem with controllable processing times;Journal of Scheduling,2015
3. Sustainability risk management;Risk Management and Insurance Review,2009
4. Cooperative game theoretic framework for joint resource management in construction;Journal of Construction Engineering and Management,2013
5. Game theory as a tool of project management;Procedia-Social and Behavioral Sciences,2015
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献