A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry

Author:

Hosseinian Amir Hossein,Baradaran VahidORCID

Abstract

PurposeThe purpose of this research is to study the Multi-Skill Resource-Constrained Multi-Project Scheduling Problem (MSRCMPSP), where (1) durations of activities depend on the familiarity levels of assigned workers, (2) more efficient workers demand higher per-day salaries, (3) projects have different due dates and (4) the budget of each period varies over time. The proposed model is bi-objective, and its objectives are minimization of completion times and costs of all projects, simultaneously.Design/methodology/approachThis paper proposes a two-phase approach based on the Statistical Process Control (SPC) to solve this problem. This approach aims to develop a control chart so as to monitor the performance of an optimizer during the optimization process. In the first phase, a multi-objective statistical model has been used to obtain control limits of this chart. To solve this model, a Multi-Objective Greedy Randomized Adaptive Search Procedure (MOGRASP) has been hired. In the second phase, the MSRCMPSP is solved via a New Version of the Multi-Objective Variable Neighborhood Search Algorithm (NV-MOVNS). In each iteration, the developed control chart monitors the performance of the NV-MOVNS to obtain proper solutions. When the control chart warns about an out-of control state, a new procedure based on the Conway’s Game of Life, which is a cellular automaton, is used to bring the algorithm back to the in-control state.FindingsThe proposed two-phase approach has been used in solving several standard test problems available in the literature. The results are compared with the outputs of some other methods to assess the efficiency of this approach. Comparisons imply the high efficiency of the proposed approach in solving test problems with different sizes.Practical implicationsThe proposed model and approach have been used to schedule multiple projects of a construction company in Iran. The outputs show that both the model and the NV-MOVNS can be used in real-world multi-project scheduling problems.Originality/valueDue to the numerous numbers of studies reviewed in this research, the authors discovered that there are few researches on the multi-skill resource-constrained multi-project scheduling problem (MSRCMPSP) with the aforementioned characteristics. Moreover, none of the previous researches proposed an SPC-based solution approach for meta-heuristics in order to solve the MSRCMPSP.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3