Purpose
– The purpose of this study is to identify the primary root causes of defects in terms of why they persist in construction, despite the increasing implementation of quality systems. Defects in construction continue to be a source of concern in the construction industry. There have been studies that have tried to identify causes of defects. Although concepts are usually related to organisational factors, previous studies have been carried out on an operational level. There is a well-trodden area within the literature relating to the operational level, but little is known about the causes of defects on a higher, organisational level within construction.
Design/methodology/approach
– A new approach based on the notion of process causality and the use of cognitive mapping has been adopted. The aim was to take a step back and unravel causes of defects in the execution of construction projects. From workshops with representatives drawn from different parts of the industry, themes have been identified and investigated from a causation perspective.
Findings
– It was found that the causes of defects mainly reside in endogenous factors within organisations as opposed to execution failure or exogenous factors related to market, material or equipment behaviour.
Originality/value
– More specifically, it was found that the dominant cause of defects lies within organisational shortcomings, suggesting that improvements can be found on the management and strategic levels within projects instead of on the operational level.
Subject
Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering
Reference62 articles.
1. Abdul-Rahman, H.
,
Kwan, C.
and
Woods, P.C.
(1999), “Quality function deployment in construction design: application in low-cost housing design”,
International Journal of Quality & Reliability Management
, Vol. 16 No. 6, pp. 591-605.
2. Ackermann, F.
and
Eden, C.
(2001), “Contrasting single user and networked group decision support systems for strategy making”,
Group Decision and Negotiation
, Vol. 10 No. 1, pp. 47-66.
3. Ackermann, F.
,
Eden, C.
and
Cropper, S.
(1992), “Getting started with cognitive mapping”, Published in the Proceedings of the 7th Young OR Conference, University of Warwick, Coventry, pp. 65-82.
4. Alashwal, A.M.
and
Abdul-Rahman, H.
(2014), “Aspects of project learning in construction: a socio-technical model”,
Construction Innovation
, Vol. 14 No. 2, pp. 229-244.
5. Aljassmi, H.
and
Han, S.
(2013), “Analysis of causes of construction defects using fault trees and risk importance measures”,
Jounal of Construction Engineering and Management
, Vol. 139 No. 7, pp. 870-880.