Exploring the quantification and measurement of public procurement performance expectations gap in community roadworks in Uganda: evidence from comprehensive survey

Author:

Kalinzi Charles,Mpeera Ntayi Joseph,Kabagambe Levi Bategeka,Muhwezi Moses,Munene John Kigozi

Abstract

Purpose This paper aims to quantify, for the first time, the performance expectations gap in community roadworks projects by proposing a performance expectations gap index (PEGI) that can answer a vital question of how wide/how narrow the gap is from a stakeholder perspective. Previous scholars have offered qualitative descriptions of the expectations gap from an auditing point of view using a constructivist approach. This study uses a positivistic approach in addressing the procurement performance expectations gap. Design/methodology/approach The index is computed by combining data from actual and perceived performance of public roadworks from two categories of respondents: “Technical personnel” and “Road users” in selected District Local Governments (DLGS) of Uganda using paired mean differences. The authors created grand means from these two groups for us to make a meaningful comparison. Data were collected from community access roads projects opened, maintained and completed and the satisfaction levels from 69 DLGS. The community leaders and political representatives formed a group of road-users, whereas DLG Engineering staff represented the technical staff. Data was collected on the extent to which the DLG had achieved performance efficiency, performance effectiveness and performance reasonableness. The measurements items was anchored along the continuum of: (5) Outstanding = Performance is consistently superior to (1) Unsatisfactory = Performance is consistently unacceptable. Findings Study findings show the level of performance of roadworks attained by technical staff is only 65%, with 15.9% gap is attributed to performance efficiency, the 29.1% gap is attributed to performance effectiveness issues and 20% gap is the perceived performance unreasonableness gap in the stakeholder’s perspective, creating an overall performance gap of 35%, in the perspective of road users. From the computations carried out, the authors determined the size of the expectation gaps by the technical DLG stakeholders and road-users of 0.3493. The gap index (0.3493) falls within the range between 0.2 and 0.39, which is a small performance expectations gap, calling for top management’s attention to identify and work on the parameters causing operational inefficiency within implementing units of DLGs. Study findings show the level of performance of roadworks attained by technical staff is 65%, creating a performance gap of 35%, in the perspective of road users. Research limitations/implications The implications of these results can ignite a meaningful debate on whether financing of road projects should be based on how narrow the performance gap should be and having sustained evidence that the gap is progressively being narrowed for improved sustainability of roadworks financing by donor agencies. Whereas this quantification of the performance gap is a new positivistic direction towards minimizing the performance expectation gap, it can easily be adopted by roadworks implementing units in assessing road-user performance needs at the point of project completion and once these are not achieved, such minor loopholes would be worked on, on a regular basis as and when need warrants. Practical implications The authors have introduced and empirically verified the performance expectation gap index, which further understands the performance expectations gap from a positivistic approach. The paper provides a problem-solving tool to analyse stakeholder engagement linkages with performance expectations variations on the practical side. Social implications The paper has started on a change perception campaign of shaping road-user critical perspectives about the outcome of community roadworks procurements. By introducing and creating a mindset of quantitative assessments in understanding the expectation gaps that can be caused by a number of factors, the responsible people for creating, maintaining and widening PEGs will eventually wake up and improve personal behaviours that lead to the widening of the procurement performance gap in roadworks, from a stakeholders’ perspective. Originality/value Unlike previous scholars who used a constructivist approach, the paper is the first of its kind to use a positivistic approach to quantify the procurement performance expectations gap using a PEGI. The use of the index gives new insights to managing procurement performance expectations to the satisfaction of stakeholders from a quantitative perspective.

Publisher

Emerald

Subject

Public Administration

Reference51 articles.

1. Moving from performance measurement to performance management;Facilities,2002

2. Supplier evaluation in local public services: application of a model of value for customer;Journal of Purchasing and Supply Management,2009

3. A multistage model of customers’ assessments of service quality and value;Journal of Consumer Research,1991

4. Minimizing the expectation gap;Allied Academies International Conference,2004

5. Boards of directors and firm performance: is there an expectations gap?;Corporate Governance: An International Review,2006

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3