1. Chan, F.T.S., Wong, T.C. and Chan, L.Y. (2006), “Flexible job‐shop scheduling problem under resource constraints”, International Journal of Production Research, Vol. 44 No. 11, pp. 2071‐89.
2. Chang, P.C., Hsieh, J.C. and Wang, C.Y. (2007), “Adaptive multi‐objective genetic algorithms for scheduling of drilling operation in printed circuit board industry”, Applied Soft Computing, Vol. 7 No. 3, pp. 800‐6.
3. Finke, D.A., Medeiros, D.J. and Traband, M.T. (2007), “Multiple machine JIT scheduling: a tabu search approach”, International Journal of Production Research, Vol. 45 No. 21, pp. 4899‐915.
4. Gupta, J.N.D., Palanimuthu, N. and Chen, C.L. (1999), “Designing a tabu search algorithm for the two‐stage flow shop problem with secondary criterion”, Production Planning & Control, Vol. 10 No. 3, pp. 251‐65.
5. Jeong, S.J., Lim, S.J. and Kim, K.S. (2006), “Hybrid approach to production scheduling using genetic algorithm and simulation”, International Journal of Advance Manufacturing Technology, Vol. 28 Nos 1‐2, pp. 129‐36.