Financing constraints of public–private partnership projects in India

Author:

Sinha Ajit Kumar,Jha Kumar Neeraj

Abstract

PurposeThe purpose of this paper is to identify the problems faced by banks, lenders, financial institutions, public authority, developers and concessionaires in course of financing of public–private partnership (PPP) road projects. Subsequently, the reasons that contribute to these problems were analyzed to come up with recommendations for mitigation of these problems.Design/methodology/approachThe methodology adopted is based on identification of financing problems and the reasons thereof, from a systematic and critical review of literature. Financing details including problems faced and reasons behind were extracted from details of one port, one airport and one road project. Data pertaining to financing of PPP road projects have been collected for completed (five projects) as well as projects under implementation (five projects) during a time interval of four months, starting from December 2018 to March 2019. The chosen three projects for case studies were executed in airport project at Kolkata in four years, offshore container terminal at Mumbai port in six years and Tuni Ankapali road project in three years. This period attains importance, as simultaneous progressive development and innovation in the PPP mode of project execution was taking place rapidly.FindingsThe commercial banks in India dominate in providing debt to the PPP infrastructure projects, especially in the road sector. The non-banking financial companies and other intermediaries were still in their infancy then, and a corporate bond market was growing steadily, though slowly. Financing problems faced by the developers resulted in unwarranted time and cost overruns emanating from delay in land acquisition and grant of approvals, with these being the two major barriers to private sector participation. Even schedule overrun finally resulted in increased construction and financing cost.Originality/valueDemand for upgradation, building and expansion of transportation infrastructure (roads) exists to keep pace with economic development. Problems like lack of a developed market for financing, inadequate institutional capacity, lack of personnel having domain expertise and absence of exclusive legislation to govern the implementation of PPP road projects are encountered by the sponsors and developers. Delay in land acquisition and environment clearance inhibits any decisive action by the lenders and investors, as these two are integrally linked to the decisions to be taken with respect to the financing of projects. Investors and bankers are generally apprehensive of their investment getting locked in or ending up as non-performing assets. Identification and proposed mitigation of these problems may likely smoothen the rough edges for the financing of projects, resulting in smoother implementation.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference37 articles.

1. CAG (2014), Comptroller and Auditor General of India, available at: https://cag.gov.in/content/report-no-36-2014-performance-audit-implementation-public-private-partnership-projects (accessed January 30, 2019).

2. Database (2013), “Database of infrastructure projects in India”, available at: www.infrastrucureindia.gov.in (accessed November 10, 2017).

3. DIPP (2017), Department of Industrial Policy and Promotion Fact Sheet, New Delhi, available at: http://dipp.nic.in/sites/default/files/FDI_FactSheet_January_ March 2017. pdf (accessed November 1, 2017).

4. G30 (2010), “G30_Long term finance and economic”, Growth Indian Express, 2015, available at: http://indianexpress.com/article/india/india-others/toll-operate- transfer-private-tolls-to-fund-new-roads (accessed October 29, 2017).

5. Evaluating the risks of public private partnerships for infrastructure projects;International Journal of Project Management,2002

Cited by 15 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3