Factors leading to design changes in Jordanian construction projects

Author:

Gharaibeh Lina Ghazi,Matarneh Sandra T.ORCID,Arafeh Mazen,Sweis Ghaleb

Abstract

PurposeThe problem of design changes in the construction industry is common worldwide, and the Jordanian market is no exception. The purpose of this paper is to identify the factors causing design changes in construction projects in Jordan in both the public and private sectors. Furthermore, this research will examine the effect of these factors on project's performance during the construction phase.Design/methodology/approachThis research commences by identifying the factors causing design changes in construction projects worldwide through an intensive literature review. The identified factors were then filtered to those applicable to the Jordanian construction market based on the results obtained from a questionnaire survey and real case construction projects. In total, 252 professionals from the Jordanian construction industry and 10 completed and/or ongoing construction projects in different parts of Jordan were compared.FindingsThe results find that the top major factors affecting design changes are owner's requirements; design errors and omissions and value engineering. The research also studies and documents the impacts of design changes on project cost, schedule and quality.Originality/valueThe results obtained from this research will assist the construction professionals representing owners, consultants and contractors in applying control measures to minimize the occurrence of the identified factors causing design changes and to mitigate their sever impacts on projects in terms of cost, schedule and quality.

Publisher

Emerald

Subject

Strategy and Management,General Business, Management and Accounting

Reference86 articles.

1. Causes of construction delay: traditional contracts;International Journal of Project Management,2002

2. Delay mitigation in the Malaysian construction industry;Journal of Construction Engineering and Management,2006

3. Statistical analysis on the cost and duration of public building projects;Journal of Management in Engineering,2010

4. Construction delays and their causative factors in Nigeria;Journal of Construction Engineering and Management,2006

5. Delay and Cost Overrun in Infrastructure Projects in Jordan,2017

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3