Construction Disputes Causes and Resolution Methods: A Case Study from a Developing Country

Author:

,Matarneh Sandra

Abstract

The increasing complexity of the construction industry, characterised by diverse multidisciplinary project teams, various stakeholders, distinctive site conditions and uncertainties, can contribute to an antagonistic environment, which may result in disputes arising between the contractual parties. Identifying the most common causes of disputes is important for an efficient contract management process. This study aims to help project stakeholders incorporate consolidative contract management strategies before commencing a new project by identifying the most common causes of construction disputes in Jordanian construction projects. Key causative factors of disputes were analysed through a literature review, a questionnaire survey and a case study analysis of construction projects in Jordan. The results revealed that the main factors leading to disputes in Jordan are incomplete technical drawings/specifications, variations initiated by the owner/consultant (additive/ deductive) and errors and omissions in the contract documents. Moreover, the results show that the most popular methods of dispute resolution in the Jordanian construction industry are negotiation and arbitration. The findings can enable local and international construction stakeholders to initiate contract management strategies before commencing projects. More effective planning can help to reduce the negative impacts of known causes of disputes.

Publisher

Penerbit Universiti Sains Malaysia

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3