Modern selection criteria for procurement methods in construction
Author:
Naoum Shamil George,Egbu Charles
Abstract
Purpose
– The purpose of this paper is to present a comprehensive literature review that seeks to address modern factors worldwide that are associated with the selection of current procurement methods. The aim is to develop an up-to-date multi-attribute procurement decision-making chart for selecting the appropriate method for the project.
Design/methodology/approach
– Stage 1 (literature review). The search engines, Emerald; Business Source Premier; Science Direct and Sage were selected to identify journals that have published the most procurement methods-related articles. The search covered the period 1980-2015. Stage 2 (Survey) – after analyzing and appraising the literature, an up-to-date utility decision-making chart for selecting the appropriate procurement method for the project was developed. The chart was based on findings from a survey that included 57 construction professionals and who have demonstrated sound experience about the various procurement options.
Findings
– There is no one best procurement method for all projects. The selection depends on the nature of the issues or problem at hand. Decision making is not a punctual act. It is often a complex process. Effective decision making also demands quality and timely information, and a careful consideration of alternatives. The multi-attribute decision-making chart presented in this paper has included modern criteria and the client would have end up with different recommendations and consequences should these criteria were not included in priority weightings.
Practical implications
– The literature review provides states-of-the art research in the field of procurement methods in construction and the multi-attribute chart is intended to offer decision makers an opportunity to broaden their horizon on the different alternatives procurement routs that could lead to different consequences.
Originality/value
– To the best of the authors’ knowledge, very few publications have discussed modern selection criteria for procurement methods in construction under one study. Therefore, this paper has established a platform for scholars and researchers to obtain more useful insights into procurement methods concerns. It has identified research trends in procurement methods which may allow industrial practitioners to appreciate the key concerns in their development of modern concepts and principles such as supply chain, lean construction, sustainability, innovation, value engineering, e-procurement and Building information modeling. The inclusion of these modern criteria will present and add value to procurement decision makers within the construction industry.
Subject
Strategy and Management,Business and International Management
Reference127 articles.
1. Abbot, C.
,
Jeong, K.
and
Allen, S.
(2006), “The economic motivation for innovation in small construction companies”,
Construction Innovation
, Vol. 6 No. 3, pp. 187-196. 2. Abidin, N.Z.
and
Pasquire, C.L.
(2005), “Delivering sustainability through value management – concept and performance overview”,
Engineering, Construction and Architectural Management
, Vol. 12 No. 2, pp. 168-180. 3. Adekunle, O.
,
Dickinson, M.
,
Khalfan, M.
,
McDermott, P.
and
Rowlinson, S.
(2009), “Construction project procurement routes: an in-depth critique”,
International Journal of Managing Projects in Business
, Vol. 2 No. 3, pp. 338-354. 4. Adetunji, I.
,
Price, A.
,
Fleming, P.
and
Kemp, P.
(2003), “Sustainability and the UK construction industry – a review”,
Proceedings of the Institution of Civil Engineers, Engineering Sustainability
, Vol. 156 No. 4, pp. 185-199. 5. Al-bizri, S.
and
Gray, C.
(2010), “Management framework for technology clusters implementation”,
Construction Management and Economics
, Vol. 28 No. 7, pp. 771-782.