Abstract
Discusses the issue of developing a project design that adequately addresses the practicality of delivering integrated construction knowledge and experience in planning, engineering, procurement and field operations. There are few practical examples in the literature that explain how non‐traditional construction project procurement approaches can be utilised to organise an integrated project management system incorporating occupational health and safety (OHS), environmental management (EM) and quality management (QM) systems. Reports on a case study that helps fill that gap. Shows how the adoption of a design and construct procurement approach, together with appropriate management techniques, on a successful major freeway project in Melbourne, Australia, was driven by a sound construction planning process, and integrated the construction planning system with OHS, EM and QM systems.
Subject
Applied Mathematics,Industrial and Manufacturing Engineering,Strategy and Management,Industrial relations,General Decision Sciences
Reference31 articles.
1. Aboulnaga, I.A. (1998), “Integrating quality and environmental management as competitive management business strategy for 21st century”, Environmental Management and Health, Vol. 9 No. 2, pp. 65‐71.
2. Akintoye, A. (1994), “Survey of contractor’s views”, Construction Management and Economics, Vol. 12 No. 2, pp. 155‐63.
3. Andersen, E.S. (1996), “Warning: activity planning is hazardous to your project’s health”, International Journal of Project Management, Vol. 14 No. 2, pp. 89‐94.
4. Ballard, G. and Howell, G. (1997), “Implementing lean construction: Reducing inflow variation”, Lean Construction, Alarcon L. Rotterdam, Netherlands, A.A. Balkema, pp. 93‐100.
5. Cohenca, D., Laufer, A. and Ledbetter, W.B. (1989), “Factors affecting construction planning efforts”, Journal of Construction Engineering and Management, Vol. 115 No. 1, pp. 70‐89.
Cited by
14 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献