Overall multiobjective optimization of construction projects scheduling using particle swarm

Author:

Elbeltagi Emad,Ammar Mohammed,Sanad Haytham,Kassab Moustafa

Abstract

Purpose – Developing an optimized project schedule that considers all decision criteria represents a challenge for project managers. The purpose of this paper is to provide a multi-objectives overall optimization model for project scheduling considering time, cost, resources, and cash flow. This development aims to overcome the limitations of optimizing each objective at once resulting of non-overall optimized schedule. Design/methodology/approach – In this paper, a multi-objectives overall optimization model for project scheduling is developed using particle swarm optimization with a new evolutionary strategy based on the compromise solution of the Pareto-front. This model optimizes the most important decisions that affect a given project including: time, cost, resources, and cash flow. The study assumes each activity has different execution methods accompanied by different time, cost, cost distribution pattern, and multiple resource utilization schemes. Findings – Applying the developed model to schedule a real-life case study project proves that the proposed model is valid in modeling real-life construction projects and gives important results for schedulers and project managers. The proposed model is expected to help construction managers and decision makers in successfully completing the project on time and reduced budget by utilizing the available information and resources. Originality/value – The paper presented a novel model that has four main characteristics: it produces an optimized schedule considering time, cost, resources, and cash flow simultaneously; it incorporates a powerful particle swarm optimization technique to search for the optimum schedule; it applies multi-objectives optimization rather than single-objective and it uses a unique Pareto-compromise solution to drive the fitness calculations of the evolutionary process.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference34 articles.

1. Abbasnia, R. , Afshar, A. and Eshtehardian, E. (2008), “Time-cost trade-off problem in construction project management based on fuzzy logic”, Journal of Applied Sciences , Vol. 8 No. 22, pp. 4159-4165.

2. Abbasy, M.S. , Zayed, T. and Elazouni, A. (2012), “Finance-based scheduling for multiple projects with multimode activities”, Construction Research Congress, ASCE, pp. 386-396.

3. Ammar, M.A. (1992), “Network compression with discrete utility data”, MS thesis, Mansoura University, Mansoura.

4. Baltar, A.M. and Fontane, D.G. (2006), “A generalized multiobjective particle swarm optimization solver for spreadsheet models: application to water quality”, in Ramirez, J.A. (Ed.), Proc. of the 26th American Geophysical Union Hydrology Days , Colorado State University, Fort Collins, CO, March 20-22, pp. 1-12.

5. Belfares, L. , Klibi, W. , Lo, N. and Guitouni, A. (2007), “Multi-objectives Tabu Search based algorithm for progressive resource allocation”, European Journal of Operational Research , Vol. 177 No. 3, pp. 1779-1799.

Cited by 65 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3