1. Tabu Search Algorithms for the resource-constrained project scheduling problem;Baar,1998
2. C.C. Barros, C.C. de Souza, A Tabu Search approach for scheduling problem under labour constraints, Technical Report IC 97/13, 1997.
3. G. Guitouni, L. Belfares, Comparison and evaluation of multi-objectives genetic algorithms for military planning and scheduling problems: COA planning, DRDC Valcartier Technical Report, 2005.
4. A hybrid heuristic for multiobjective Knapsack problems;Ben Abdelaziz,1999
5. Minimization du coût de disponibilité des ressources d’un projet sous contrainte de temps par une adaptation de la méthode Tabou;Boctor;INFOR,2002