Cost-risk contingency framework for managing cost overrun in metropolitan projects: using fuzzy-AHP and simulation

Author:

Afzal FarmanORCID,Yunfei Shao,Junaid Danish,Hanif Muhammad ShehzadORCID

Abstract

PurposeRisk analysis plays a vital role in controlling and managing cost overruns in complex construction projects, particularly where uncertainty is high. This study attempts to address an important issue of cost overrun that encountered by metropolitan rapid transit projects in relation to the significance of risk involved under high uncertainty.Design/methodology/approachIn order to solve cost overrun problems in metropolitan transit projects and facilitate the decision-makers for effective future budgeting, a cost-risk contingency framework has been designed using fuzzy logic, analytical hierarchy process and Monte Carlo simulation.FindingsInitially, a hierarchical breakdown structure of important complexity-driven risk factors has been conceptualized herein using relative importance index. Later, a proposed cost-risk contingency framework has investigated the expected total construction cost in order to consider the additional budgeted cost required to mitigate the risk consequences for particular project activity. The results of cost-risk analysis imply that poor design issues, an increase in material prices and delays in relocating facilities show higher dependency and increase the risk of cost overrun in metropolitan transit projects.Practical implicationsThe findings and implication for project managers could possibly be achieved by assuming the proposed cost-risk contingency framework under high uncertainty of cost found in this research. Furthermore, this procedure may be used by experts from other engineering domains by replacing and considering the complex relationship between complexity-risk factors.Originality/valueThis study contributes to the body of knowledge by providing a practical contingency model to identify and evaluate the additional risk cost required to compute total construction cost for getting stability in future budgeting.

Publisher

Emerald

Subject

Strategy and Management,Business and International Management

Reference62 articles.

1. Risk assessment of first overseas mass rapid transit project: promulgating interpretive qualitative paradigm for China Pakistan construction concession;International Transaction Journal of Engineering, Management, and Applied Sciences and Technologies,2018

2. Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects;Journal of Civil Engineering and Management,2017

3. An analytical network process model for risks prioritisation in megaprojects;International Journal of Project Management,2015

4. Fuzzy hierarchical analysis;Fuzzy Sets and Systems,1985

5. A computerized method for delay risk assessment based on fuzzy set theory using MS ProjectTM;KSCE Journal of Civil Engineering,2018

Cited by 20 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3