Benchmarking parties’ obligations in the execution of concession-based PPP projects in Nigeria

Author:

Opawole Akintayo,Jagboro Godwin Onajite

Abstract

Purpose Demand–supply matrices with adverse consequences has occasioned government response to concession initiatives in infrastructure in Nigeria. However, concession-based projects have been trailed by administrative and legal controversies. While this scenario has negatively impacted the acceptability of a concession contract, there is, nevertheless, a paucity of research effort aimed at developing a sustainable framework. The purpose of this paper is to develop a conceptual framework for the evaluation and allocation of obligations of parties, thereby enhancing the synergy and cooperation between the public and private sector organization. Design/methodology/approach Data were obtained through a questionnaire administered to professionals in concession-based contracts in southwestern Nigeria, which included architects, estate surveyors, quantity surveyors, engineers and builders, accountants/bankers/economists and lawyers. The respondents were selected using random and respondent driven sampling approaches. The questions were structured to ensure that the respondents have appropriate experience in concession-based projects and hold appropriate positions as decision-makers so as to give credence to the collected data. Findings The study identified 47 contractual obligations in the specific context of developing countries. Based on “half-adjusting principle”, 13 of the obligations notably cost of land acquisition and cost of social disturbances were allocated to the public party; 18 of the obligations notably project design and cost of feasibility study were allocated to the private party; and 16 of the obligations including preparation of terms of a contract and relocation of third party facilities were shared by the parties. Originality/value The framework benchmarked the categorization of public and private parties’ obligations in concession-based public–private partnership (PPP) contracts. The study has the implication for the evaluation and allocation of obligations of parties, which could mitigate the risk of failure of PPP projects in relation to the specific context of developing countries.

Publisher

Emerald

Subject

Marketing,Strategy and Management,Tourism, Leisure and Hospitality Management,Urban Studies,Geography, Planning and Development,Business and International Management

Reference54 articles.

1. Good project governance for proper risk allocation in public-private partnerships in Indonesia;International Journal of Project Management,2006

2. An examination of the need for public private partnership in the provision of urban infrastructure in lagos metropolis;IFE Journal of Environmental Design and Management,2010

3. Agande, B. (2012), “FG terminates Lagos-Ibadan Expressway contract”, The Vanguard, available at: www.vanguardngr.com/2012/11/fg (accessed 6 July 2013).

4. Performance assessment of a private finance initiative road project;Transport,2013

5. Adoption of public-private partnerships (PPP) procurement method on infrastructure delivery in Nigeria;Journal of the Nigerian Institute of Quantity Surveyors,2014

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3