Profiling causative factors leading to construction project delays in the United Arab Emirates

Author:

Mpofu Bekithemba,Ochieng Edward Godfrey,Moobela Cletus,Pretorius Adriaan

Abstract

Purpose A voluminous amount of research has been conducted on project delay in the recent past; however, the persistence of the problem demands that a relentless quest for solutions is upheld. It can be argued that the problem is likely to be more pronounced in areas where development pressure is the highest. One such area is the United Arab Emirates (UAE) where the construction industry is said to have reached an unparalleled position in the last decade. The purpose of this paper is to identify the most significant causes of delays in the UAE construction industry. Design/methodology/approach A survey was conducted targeting three key types of stakeholders, namely clients, contractors and consultants. Validity and reliability were achieved by first assessing the plausibility of construction delay variables in UAE. The verification took place after the interpretation of quantitative data, this involved presenting the findings to the main participants. The validation took place after the verification process. Rigour was achieved by engaging participants previously engaged in UAE and focussing on verification and validation, this included responsiveness of the researchers during group discussions, methodological coherence, appropriate sampling frame and data analysis. Findings From the analysis, the study unveiled a number of important causes of construction delays in the UAE, ranging from unrealistic contract durations to poor labour productivity, with consultants and clients seemingly shouldering the bulk of the “blame game”. It was evident that all the three main stakeholders in a construction project (clients, consultants and contractors) need to change their existing practices in order to ensure timely delivery of projects. The research also confirms that delays are country specific and appear to be time related hence they should be viewed within the social, economic and cultural settings of the UAE. Research limitations/implications A major limitation of the current study was the use of a single approach to facilitate data collection. Practical implications It was evident that practitioners need to change their existing practices in order to ensure timely delivery of projects. Continuous coordination and relationship between practitioners are required through the project life cycle in order to solve problems and develop project performance. Originality/value As suggested in this study methods should be put in place to reduce long and bureaucratic processes within the client’s organisations, not only to fulfil the requirements of the contract but also to suite fast-track projects.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference88 articles.

1. Trends of skills and productivity in UK construction industry;Engineering, Construction and Architectural Management,2008

2. Delay mitigation in the Malaysian construction industry;Journal of Construction Engineering Management,2006

3. Conflicting factors in construction project: Korean perspective;Engineering, Construction and Architectural Management,2006

4. Delays in construction: a brief study of the Florida construction industry,2003

5. Al-Aghbari, W.A.M. (2005), “Factors affecting construction speed of industrialised building systems in Malaysia”, master’s thesis, University Putra Malaysia, Serdang.

Cited by 99 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3