Author:
AL‐TABTABAI HASHEM,KARTAM NABIL,FLOOD IAN,ALEX ALEX P.
Abstract
Construction projects are susceptible to cost and time overruns. Variations from planned schedule and cost estimates can result in huge losses for owners and contractors. In extreme cases, the viability of the project itself is jeopardised as a result of variations from baseline plans. Hence new methods and techniques which assist project managers in forecasting the expected variance in schedule and cost should be developed. This paper proposes a judgment‐based forecasting approach which will identify schedule variances from a baseline plan for typical construction projects. The proposed forecasting approach adopts multiple regression techniques and further utilises neural networks to capture the decision‐making procedure of project experts involved in schedule monitoring and prediction. The models developed were applied to a multistorey building project under construction and were found feasible for use in similar construction projects. The advantages and limitations of these two modelling process for prediction of schedule variance are discussed. The developed models were integrated with existing project management computer systems for the convenient and realistic generation of revised schedules at appropriate junctures during the progress of the project.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献