Green building projects: schedule performance, influential factors and solutions

Author:

Hwang Bon-Gang,Zhao Xianbo,Tan Lene Lay Ghim

Abstract

Purpose – The purposes of this paper are to: investigate schedule performance of new and retrofitting green building projects; identify the critical factors that influence the schedule performance of new and retrofitting green building projects; and provide solutions to improve schedule performance of new and retrofitting green building projects. Design/methodology/approach – A questionnaire survey were conducted and responses were received from 34 firms experienced in green building projects in Singapore. After the data from the survey had been analyzed, face-to-face interviews were conducted with two senior project managers to solicit comments on the survey results. Findings – This study identified the degree of project delay in 98 new green building projects and 51 retrofitting green building projects in Singapore. The result indicated that 22 percent of the Singaporean green building projects were plagued with delay and retrofitting projects had a significantly higher likelihood of delay and significantly longer extension than new projects. In addition, “consultant cooperation to solve problems” was the most influential to schedule performance of both new and retrofitting green building projects, and the two project groups agreed on the overall ranking of the factors affecting schedule performance. Research limitations/implications – There may be geographical limitation on the conclusions drawn from the findings. Also, the sample size was still small, despite a relatively high response rate. In addition, the majority of the respondents were contractors as other project players were reluctant to respond to the survey. Practical implications – This study provides a clear understanding of the schedule performance of green building projects as well as the critical factors that should be highlighted when constructing green building projects. Also, strategies to overcome the negative impact of these factors allow practitioners to better deal with the potential causes of delay and to attain the schedule performance. Originality/value – Although construction delays have been widely investigated in previous studies relating to construction management, few have attempted to analyze the schedule performance of new and retrofitting green buildings. Thus, this study adds significantly to the existing research on both green building and construction delay.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Cited by 82 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3