Improving transparency in construction management: a visual planning and control model

Author:

Brady Denise Ann,Tzortzopoulos Patricia,Rooke John,Formoso Carlos Torres,Tezel Algan

Abstract

Purpose The purpose of this paper is to discuss a production planning and control model known as the Lean construction management (LCM) model, which applies a number of visual tools in a systematic way to the planning and control process. The application of the visual tools in this way facilitates the flow of information, thus improving transparency between the interfaces of planning, execution and control. Design/methodology/approach Design Science research is adopted for this investigation, which analyses the original development of the model and reports on its testing and refinement over different types of projects. The research is divided into three parts, each part focussing on a different stage of development and construction project type. Findings The main findings are related to the benefits of visual management in the construction planning and control process, such as maintaining consistency between different planning levels, so that feasible execution plans are created; control becomes more focussed on prevention rather than correction, and creates opportunities for collaborative problem solving. Moreover, the physical display of the visual tools in a discrete planning area on-site encourages a regular exchange between participants on actual work progress as it unfolds, leading to more timely reaction to the problems at hand. Originality/value The problem of a lack of transparency in construction planning and control leads to communication issues on-site, poor process orientation and high levels of waste. LCM improves process transparency by making information related to system-wide processes more readily available to project participants. This enables them to foresee problems in a timely manner and to take necessary measures to resolve them or to adapt the process to current circumstances. The LCM model proposes a new way of applying visual tools and controls systematically to improve transparency in construction planning and control.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference66 articles.

1. Last Planner system: experiences from pilot implementation in the Middle East,2009

2. Exploring lean construction practice, research, and education;Engineering, Construction and Architectural Management,2012

3. Production control principles,2009

4. Visual management and shop floor teams–development, implementation and use;International Journal of Production Research,2016

Cited by 32 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. A morphology-Euclidean-linear recognition method for rebar point clouds of highway tunnel linings during the construction phase;Engineering, Construction and Architectural Management;2024-08-14

2. Design science research and the co-creation of project management knowledge;International Journal of Project Management;2024-04

3. Lean Construction Strategies Supported by Artificial Intelligence Techniques for Construction Project Management—A Review;International Journal of Online and Biomedical Engineering (iJOE);2024-02-27

4. Automated progress monitoring technological model for construction projects;Ain Shams Engineering Journal;2023-10

5. Increase in the Satisfaction Index in a Restaurant through the Application of Value Stream Mapping and Visual Management;Proceedings of the 2023 9th International Conference on Industrial and Business Engineering;2023-09-22

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3