A structural equation model for enhancing effectiveness of engineering, procurement and construction (EPC) major projects

Author:

Aldhaheri Mohamed,Bakchan Amal,Sandhu Maqsood Ahmad

Abstract

Purpose The purpose of this paper is to define and analyze causal factors shaping the effectiveness of engineering, procurement and construction (EPC) major projects in meeting the product objectives, from the end-user’s perspective. Design/methodology/approach An online survey questionnaire was developed and administered to end-users working in major oil and gas projects. Data collection process was initiated on, around 275 end-users, and 213 responses were received, achieving a high response rate of 77 percent. Findings The results indicate that both alignment of objectives and end-user’s engagement factors exhibit a positive influence on effectiveness of EPC, with the former having higher contribution than the latter. In this context, the product success triangle reveals higher preference of the end-user’s team toward quality than schedule and cost objectives. Research limitations/implications Shifting the efforts of involving the end-user forward in time, starting from the planning stage, alleviates the adverse impacts of design changes as well as increases the ability to save cost, improve performance and increase end-user’s satisfaction. Practical implications The model raises the awareness of oil and gas industry practitioners toward the critical factors influencing the project effectiveness and proposes useful techniques for maintaining proper alignment between project and product objectives as well as facilitating end-user’s engagement at the site level. As such, it can serve as a motivation tool for aligning the objectives and acknowledging the engagement, with the aim of achieving the product success. Originality/value The effectiveness of EPC structural model was developed and tested using PLS–structural equation modeling statistical technique. The interpretation of the structural model demonstrated that both end-user’s engagement and alignment of objectives are essential to successfully achieve project effectiveness.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference59 articles.

1. Cost recovery strategy for large-scale irrigation projects in Nigeria;Technovation,2003

2. AEC (2015), “Executive guide to BIM: part 2”, available at: http://aecmag.com/technology-mainmenu-35/564-executive-guide-to-bim-part-2 (accessed November 26, 2015).

3. Keeping oil & gas EPC major projects under control: strategic & innovative project management practices,2016

4. ADCO’s experience and lessons learnt in managing major project (Bu Hasa Facilities Development),2008

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3