Identification of critical risk factors in public-private partnership project phases in developing countries

Author:

Babatunde Solomon Olusola,Perera Srinath,Adeniyi Onaopepo

Abstract

Purpose Public‐private partnerships (PPPs) are being faced by risk threats, notwithstanding the fact that the PPP model has been structured in a way that the associated risks are shared by both the public and private sectors. Consequently, the sources of risk change over the PPP project phases. Thus, the purpose of this paper is to identify and assess the risk factors in PPP infrastructure project phases comprising development phase, construction phase, operation phase and project life cycle through an empirical approach. Design/methodology/approach The study adopted four different data-gathering approaches including literature review, desk review, brainstorming session and questionnaire survey. In order to capture a broad perception of stakeholders, the questionnaires were administered to three different stakeholder organizations to include public sector authorities (i.e. ministries, department and agencies), concessionaires and lenders/banks involved in different PPP infrastructure projects implementation in Nigeria. A total of 81 questionnaires were administered, out of which 63 were retrieved but after checking through the completed questionnaires, 60 questionnaires were found suitable for the analysis. Data collected were analyzed using descriptive statistics, mean score, Kruskal–Wallis test and the risk significance index in terms of severity and likelihood of occurrence conducted. Findings In total, 70 risk factors were identified with respect to PPP project phases and their relative importance was gauged. In addition, the analysis of total 70 risk factors in the development phase, construction phase, operation phase and project life cycle phase indicated that 51 risk factors are located in the yellow zone, which is considered as moderate and 19 risk factors are located in the red zone that are regarded as critical. Practical implications The identification of specific critical risk factors in each PPP project phase will provide a benchmark in developing risk management programs in developing countries. Originality/value These study findings would be useful for PPP stakeholders to focus their attention, priorities and leadership in managing these critical risk factors. Furthermore, the findings of this study are significant in providing an in-depth understanding of the current Nigeria’s PPP market environment, which is a true reflection of developing countries as a whole.

Publisher

Emerald

Subject

Business and International Management,Strategy and Management

Cited by 26 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Tactical Conflict Prevention Strategies in Public–Private Partnerships: Lessons from Experts;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2024-02

2. INDUSTRIAL PARKS IN LATVIA;SGEM International Multidisciplinary Scientific GeoConference� EXPO Proceedings;2023-10-01

3. Principal Risks Associated with Public-Private Partnership Projects in Uganda;Public Works Management & Policy;2023-04-10

4. A novel Z-number based Real Option (ZRO) model under uncertainty: Application in Public-Private-Partnership refinancing value evaluation;Expert Systems with Applications;2023-03

5. Public–Private Partnership Highway Projects: Identifying Project Selection Factors;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2023-02

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3