Risk ranking and analysis in PPP water supply infrastructure projects

Author:

Ameyaw Ernest Effah,Chan Albert P.C

Abstract

Purpose – This paper aims to identify and evaluate the most significant risk factors that strongly affect the implementation of public–private partnership (PPP) water supply projects. PPP for water supply infrastructure services has seen continued growth over the past two decades, following public sector’s budgetary constraints and inability to provide infrastructure-based water services efficiently and cost effectively. However, these projects are often subjected to major risks leading to failures. Design/methodology/approach – Following extensive literature review and case study analyses, an international questionnaire survey was conducted with practicing and experienced PPP experts to establish the significant risks in PPP water projects. Both the probability of occurrence and severity of 40 risks were evaluated by the expert panel to determine their significance and impact on water projects procured under the PPP arrangement. Findings – The paper presents a derived risk factor list, ranks the factors and describes the “top-ranked” risk factors as: poor contract design, water pricing and tariff review uncertainty, political interference, public resistance to PPP, construction time and cost overrun, non-payment of bills, lack of PPP experience, financing risk, faulty demand forecasting, high operational costs and conflict between partners. Originality/value – This factor list broadens PPP stakeholders’ view of important project risks, rather than relying on culture-dependent studies – an area that has received less attention in PPP risk management research. The identified risk factors would provide governments and investors a useful tool in implementing constructive water PPPs by facilitating the development of risk mitigation strategies, particularly for developing countries with poor risk management practices.

Publisher

Emerald

Subject

Building and Construction,Architecture,Human Factors and Ergonomics

Reference83 articles.

1. ADB (2000), Developing Best Practices for Promoting Private Sector Investment in Infrastructure: Water Supply , Asian Development Bank, Philippines, Manila.

2. ADB (2009), Urban Water Supply Sector Risk Assessment: Guidance Note , Asian Development Bank, Manila.

3. Ameyaw, E.E. (2012), Risk Allocation Model for PPP Water Supply Projects in Ghana: A report in Fulfilment of Confirmation of PhD Study , Department of Building and Real Estate, The Hong Polytechnic University, Hong Kong.

4. Ameyaw, E.E. and Chan, A.P.C. (2013), “Identifying public-private partnership (PPP) risks in managing water supply projects in Ghana”, Journal of Facilities Management , Vol. 11 No. 2, pp. 152-182.

5. Andrews, D. , Nonnecke, B. and Preece, J. (2003), “Electronic survey methodology: a case study in reaching hard to involve internet users”, International Journal of Human-Computer Interaction , Vol. 16 No. 2, pp. 185-210.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3