Key risk factors affecting renewable energy independent power producer (IPP) set-up projects in developing countries

Author:

Addy Michael Nii,Akunyumu Stephen,Simons Barbara

Abstract

Purpose Sustained access to efficient electricity plays an essential role in improving living conditions of people and contributes to the economic development of the nation as a whole. Volta River Authority (VRA) mainly manages the generation plants (hydropower sources and thermal plants) alongside independent power producers (IPPs). Power generation in the country has been influenced by myriads of factors. Thus, the purpose of this study is to assess the key risk factors affecting renewable energy of IPPs set-up project in Ghana. Design/methodology/approach Quantitative approach was adopted for the study. Empirical investigation was carried out using the survey approach. The likelihood of occurrence of the risk and the degree of impact of same motivated the use of risk significance index to analyze the data and make deductions from the results. Findings From the study, three key risk factors have high level of severity, which include long and complex procedures for authorization of project activities, stability of the policy environment and ease of obtaining rights to land. These risks could be found in the business/strategic risks and policy/regulatory risks categories, respectively. A total of 25 key risk factors had moderate level of severity and 12 key risk factors have low level of severity on renewable energy IPP set up projects. Practical implications Top-ranked risk factors require maximum attention. The identified risks should be alleviated with strategies to reduce levels of severity by targeting either the likelihood of occurrence or the level of impact. This will serve as a catalyze to promoting renewable energy IPP set-up projects in Ghana. Originality/value Key contribution of the paper to the body of knowledge is demonstrated by the empirical evidence of the risks IPPs are likely to encounter in setting up renewable energy plants in Ghana. The distinctive attribute of this study is further demonstrated by the fact that it focused on the set-up stage, which is a critical stage in the renewable energy provision value chain.

Publisher

Emerald

Subject

General Engineering

Reference36 articles.

1. Identifying risks and mitigation strategies in private sector participation (PSP) in power generation projects in Ghana;Journal of Facilities Management,2017

2. Evaluating key risk factors for PPP water projects in Ghana: a Delphi study;Journal of Facilities Management,2015

3. Risk-based analysis and policy implications for renewable energy investments in Greece;Energy Policy,2017

4. Bensah, E.C. Kemausuor, F. Antwi, E. and Ahiekpor, J. (2015), “China-Ghana South-South cooperation on renewable energy technology transfer”, available at: www.undp.org/content/dam/ghana/docs/Doc/Susdev/UNDP_GH_SUSDEV_C-G_Identification of%20barriers%20to%20renewable%20energy%20technology%20transfer.pdf (accessed 24 May 2019).

5. Financing energy projects: experience of the international finance corporation;Energy Policy,1995

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. A new solar powered robotic arm guided master–slave electric motors of biomass conveyor;Journal of Engineering, Design and Technology;2022-02-17

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3