An evaluation of risk factors impacting project budget performance in New Zealand

Author:

Adafin Johnson,Rotimi James O.B.,Wilkinson Suzanne

Abstract

Purpose There has been a lack of research, particularly within the New Zealand (NZ) context, focusing on the identification and assessment of risk factors for construction projects, leading to a wide variation between design-phase elemental cost plans (ECPs) and the outturn tender sums (OTS). Still to be investigated is how risks interact to produce such variability. This study aims to determine the risk-influencing factors, identified through risk measurement, during design development. Design/methodology/approach This study adopted literature review and online questionnaire survey. The literature review was used to identify the factors affecting project budgetary performance, which was used to design the questionnaire survey culminating in data analysis. The questionnaire was administered to 64 practising project managers (PMs) in NZ. Their responses were analysed using descriptive statistics, mean ranking analysis, degree-of-risk measure and correlational analysis, to find the top-five risk factors impacting the variability observed, through ranking the mean and degree of risk values that produce such variability. Findings Significant risk factors were identified from the questionnaire survey analysis, such as changes in project owner/stakeholder requirements, experience of project team, site condition information, competency of consultants and information flow and quality. These provided some insights in explaining the variability between the design-phase ECPs and OTS based on risk impacts from PMs’ viewpoints. Research limitations/implications Findings revealed a drift of 23.86% in budgeted costs (inflated risks), which seems significant. Prioritising top risk factors may provide handy information for researchers on the variables that could be relied upon for the development of a forecasting model for application in NZ. Practical implications The study findings have implications for PMs seeking to provide information on mitigation strategies by using risk management approach, considering the influence of development risks on building project delivery and, consequently the project owner’s financial position. To guard against wide variation between design-phase ECPs and OTS, the main contribution of this study is to raise consultants’ awareness of the important risk factors for their planning at the outset, thus assisting PMs in pro-actively managing their clients' budgets. Originality/value This study creates value by synthesising literature on construction project budgeting and highlighting areas for further research. By giving adequate attention to key risks associated with budget overruns in commercial projects, variability between ECPs and OTS, a common phenomenon in NZ, can be controlled to achieve cost savings. Based on this, further study suggests the development of a model that could assist the stakeholders in NZ to more reliably predict OTS from the design-phase ECP and pro-actively avoid unfortunate budget/cost overruns, disputes and even project abandonment.

Publisher

Emerald

Subject

General Engineering

Reference82 articles.

1. Why do the design stage elemental cost plan and final tender sum differ in New Zealand;Journal of Financial Management of Property and Construction,2015

2. Determining significant risks in the variability between design-stage elemental cost plan and final tender sum;ASCE Journal of Management in Engineering,2016

3. Risk impact assessments in project budget development: architects’ perspectives;Architectural Engineering and Design Management,2016

4. Risk impact assessments in project budget development: Quantity surveyors’ perspectives;International Journal of Construction Management,2018

5. Evaluating the budgetary reliability of design stage elemental cost plan in building procurement,2016

Cited by 11 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3