Critical Factors Contributing to Budget Overruns in Ghana’s Telecommunication Industry Construction Projects

Author:

Asiedu Ernest Marfo, ,Mkansi Marcia,

Abstract

This study sought to examine the occurrence of and the most critical factors that cause budget overruns in Ghana’s telecommunications industry construction projects by applying an exploratory sequential mixed method approach. A multiple case study approach was initially adopted to ensure a greater understanding of the differences and similarities between four cases drawn from companies engaged in the construction of network expansion projects. This was followed by a survey of 230 practitioners responsible for managing construction projects within the industry. The software program, ATLAS.ti, Statistical Package for the Social Sciences (SPSS) and AMOS version 25.0 were used in the data analysis. Exploratory factor analysis and structural equation modelling were performed to test and validate the hypothetical model developed to illustrate the most critical factors that cause budget overruns. The findings resulted in the final model dubbed “Budget Overrun Flowerpot”, which provides practitioners with a better understanding of the most critical causal factors that must be managed appropriately to improve project efficiency and budget performance.

Publisher

Penerbit Universiti Sains Malaysia

Subject

Architecture,Management of Technology and Innovation,Strategy and Management,Building and Construction

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3