Performance reporting delay in local government: a global south view

Author:

Kaye-Essien Charles WhartonORCID

Abstract

PurposeThe object of this paper is to understand how central–local relations and internal technical characteristics contribute to performance reporting delays at the local level in a Global South context.Design/methodology/approachThe paper develops and tests four propositions using a combination of secondary data analyses and semistructured interviews with 30 local government officials.FindingsThe findings indicate that delays in performance reporting are generally high in pre-election years because leadership commitments at the local level largely shift toward national politics (campaigning for re-election of the president). Additional reporting delays were found to be the result of low financial capacity to maintain appropriate data collection and management systems, lack of highly trained monitoring and evaluation experts at the local level and lack of sanctions for noncompliance.Research limitations/implicationsThe fact that some types of Districts (large municipalities and metro areas with access to large financial resources) were excluded from the analysis induces some bias to the findings. The choice of 30 out of a total 260 local governments limits the analyses to only 12% of views and perceptions of local government reporting delay. Additionally sourcing responses from a few monitoring and evaluation (M&E) personnel out of hundreds of mid- to upper-level employees limited the breath of discussions that could have resulted from a broader study.Practical implicationsThe results of this paper suggest that any attempt at imposing sanctions on late reporting may not be very successful since national party politics, which lie outside the control of municipalities, is one of the main factors that drive reporting delay. Rather than imposing sanctions, government should consider incentivizing the reporting process. On the other hand, since internally generated funds (IGF) and the M&E team are factors that lie within the control of the municipality, any attempt to decrease reporting delay should first focus on improving local revenues and strengthening municipal M&E capacity building.Originality/valueThis paper adds to the existing literature by offering directions for approaching performance reporting delay in two ways. First, it emphasizes central–local relations as an important political determinant of performance reporting delay. Second, it explores reporting delay in Ghana's local governments and therefore provides useful insights from a Global South perspective.

Publisher

Emerald

Subject

Management, Monitoring, Policy and Law,Political Science and International Relations,Public Administration,Geography, Planning and Development

Reference40 articles.

1. Annual progress report for 2012;Abura Asebu Kwamankese District,2012

2. Government internal audits: the determinants of quality supervisory review of audit documentation;International Journal of Public Administration,2013

3. Factors influencing the use of performance data to improve municipal services;Public Administration Review,2008

4. An unbreakable path? A comparative study of decentralization and local government development trajectories in Ghana and Uganda;International Review of Administrative Sciences,2011

5. Decentralization and governance in Ghana;Regional Development Dialogue,2008

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Predictors of strategic procurement performance metrics adoption in county governments: empirical evidence from Kakamega county government, Kenya;LBS Journal of Management & Research;2023-02-06

2. Project Performance Reporting in New South Wales Local Government;International Journal of Public Administration;2022-10-10

3. References;Public Sector Reform in South Africa 1994–2021;2022-08-02

4. Donors and local taxation: assessing the influence of development assistance on municipal revenue generation;International Public Management Journal;2021-05-04

5. Personnel Analysis of Municipal Authorities;Digital Economy and the New Labor Market: Jobs, Competences and Innovative HR Technologies;2020-10-18

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3