Assessment of early warning signs in hospital projects' front-end phase

Author:

Larsen Anne Strand AlfredsenORCID,Karlsen Anniken ThORCID,Lund Jo-ÅsmundORCID,Andersen Bjørn SørskotORCID

Abstract

PurposeThe front-end phase plays an important role in achieving project success, and establishment of performance measurement systems considering project challenges or pitfalls is a way of keeping track of this phase. Early warning signs, a type of proactive performance indicators, may serve as means for improving decision-making and project processes aiming for short- and long-term project success. In this paper, the authors present findings from a study on early warning signs (EWS) in hospital projects' front-end. A preliminary systematisation of identified signs as a contribution to front-end improvement is provided.Design/methodology/approachThe paper is based on a mixed methods approach, using a sequential, exploratory research design comprising document studies, interviews and a survey.FindingsThe authors identified 62 challenges for hospital projects' front-end performance and further established four categories of EWS as follows: (1) structure and tools, (2) context and frame factors, (3) management and (4) relational factors and properties. This mirrors the presence of hard and soft issues from previous studies. There is need for clarifying terminology and raising consciousness on EWS. Processual approaches to identify EWS are considered more useful than subsequent established indicators.Originality/valueThe findings from this paper provide insight into EWS in hospital projects' front-end phase. This adds to the general understanding of EWS and contributes to more knowledge on the front-end phase in general.

Publisher

Emerald

Subject

Strategy and Management,Business and International Management

Reference72 articles.

1. Causes, early warning signs, and impacts of out-of-sequence construction: expert-based survey analysis;Journal of Management in Engineering,2019

2. Assessment of early warning signs predisposing building projects to failure in Nigeria;Journal of Engineering, Design and Technology,2020

3. Managing strategic surprise by response to weak signals;California Management Review,1975

4. Grasping project complexity in large engineering projects: the TOE (Technical, Organizational and Environmental) framework;International Journal of Project Management,2011

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3