Author:
Adebisi Emmanuel Oluwatobi,Alao Oluwaseyi Olalekan,Ojo Stephen Okunlola
Abstract
PurposeThe continuous failure of construction projects notwithstanding appreciable increase in project management knowledge has necessitated a proactive approach of assessing early warning signs (EWS) of building projects failure. Building projects are expected to show warning signs before experiencing crises, comparable to a patient displaying symptoms of a disease. Thus, this study aims to examine the EWS that predisposed building projects to failure in Nigeria to provide empirical data for enhancing projects delivery.Design/methodology/approachPrimary data were used for the study. Structured questionnaire was administered to consultants and contractors’ personnel within Lagos State, Nigeria. A total of 180 copies of questionnaire were administered and 134 copies (combined response rate of 74.44 per cent) were retrieved. Frequency distribution, percentages, mean item score and Mann–Whitney test were used to analyse the data.FindingsMost construction professionals applied the EWS approach from project planning and early construction phase. The most significant EWS predisposing building projects to failure were “Management inability and incompetence to proactively detect and manage problems at early project stages”, “Actual expenditure is constantly shooting beyond cost estimates” and “Incurred costs already getting higher than the anticipated benefits”. Project/construction management-related symptoms are most significant to predisposing building projects to failure.Practical implicationsThe study provided implications for effective project management of building projects through proactive approach which is very paramount to improving the delivery of building projects in Nigeria.Originality/valueThe study provides implications for proactive management of building projects, thereby enhancing the delivery of building projects.
Reference61 articles.
1. The effects of construction delays on project delivery in Nigerian construction industry;International Journal of Project Management,2002
2. Analysis of construction delay causes in dams projects in Oman;European Journal of Business and Social Sciences,2017
3. Assessment of causative factors for project abandonment in Nigerian public tertiary educational institutions;International Journal of Building Pathology and Adaptation,2017
4. Factors for containing failure and abandonment of public sector construction projects in Nigeria;Journal of Building Performance,2015
5. Reliability and validity testing of a new scale for measuring attitudes toward learning statistics with technology;Acta Didactica Napocensia,2011
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献