Selection of dispute resolution methods: factor analysis approach

Author:

Chong Heap‐Yih,Mohamad Zin Rosli

Abstract

PurposeThe purpose of this research is to discover the behavior of dispute resolution in the Malaysian construction industry by analyzing factors that affect the selection of dispute resolution methods using factor analysis approach.Design/methodology/approachPreliminary interviews and a questionnaire survey were conducted. Dispute resolution methods were grouped and discussed together, based on the similarity of their characteristics, and used for the questionnaire survey. This research approach is different from the earlier studies that mostly focused on a single dispute resolution method. The data were further analyzed with factor analysis. This improved the data interpretation.FindingsSeven latent factors were extracted and revealed that the contractors and developers preferred alternative dispute resolution (ADR). However, the appreciation of the outcomes of ADR was perceived to be very low. Arbitration and litigation were in part accepted and agreed upon by the respondents.Originality/valueThe combined results from the literature review on the stages of dispute resolution and the latent factors affecting the selection of dispute resolution methods could assist in decision making. The selection of ADR or non‐ADR itself is not a major issue; rather, there is a concern for increased efficiency and an appreciation of the methods in the construction industry are more demanding.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Cited by 54 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Theoretical Framework to Enhance the Level of Achieving Desired Outcomes of Alternative Dispute Resolution in the Construction Industry;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2024-11

2. Arbitration in Construction Project Disputes over the Last Decade: Bibliometric and Content Analysis;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction;2024-11

3. Forecasting the outcomes of construction contract disputes using machine learning techniques;Engineering, Construction and Architectural Management;2024-09-10

4. The Status and Challenges of Contract Farming Engagement in Gimbo District, Kafa Zone, South West Ethiopia People’s Region, Ethiopia;World Journal of Agricultural Science and Technology;2024-08-06

5. Unveiling factors influencing the duration of arbitration practice in the Tanzania construction industry;International Journal of Building Pathology and Adaptation;2024-06-17

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3