Optimal preventive maintenance policy for leased equipment for free with minimum quantity of consumables purchasing commitment by the lessee

Author:

Tlili LazharORCID,Anis ChelbiORCID,Bouazizi MokhlesORCID

Abstract

PurposeThis paper deals with a particular type of leasing contracts according to which an equipment is leased for free with the condition for the lessee to purchase a predetermined minimum quantity of consumables during each leasing period. Maintenance actions are performed by the lessor and borne by him. Imperfect preventive maintenance is carried out every t time units throughout the leasing period. Minimal repairs are performed following equipment failures. At the end of the leasing period, an overhaul which restores the equipment to “as good as new” state is performed. The equipment is leased many times during its life cycle. The purpose of this paper is to determine the values of the decision variables for the lessor, which are the preventive maintenance (PM) period and the minimum quantity of consumables to be sold to ensure profit.Design/methodology/approachA mathematical model is developed to express the expected maintenance cost per time unit incurred by the lessor as well as his expected profit over the equipment life cycle. The optimal PM period minimizing the maintenance cost is determined first. Then, given the corresponding minimum maintenance cost, the minimum quantity of consumables (the lessor's break-even point) to be purchased by the lessee is computed. A numerical example and a sensitivity study are presented, and the obtained results are discussed.FindingsThe outcome of this work is supposed to help the lessors determining two key values to be included in each leasing contract, namely: (1) the periodicity according to which they will commit to perform preventive maintenance actions such that their average total cost of maintenance is minimized, (2) the minimum quantity of consumables that the lessee must commit to purchasing during the leasing period. This quantity must be between the break-even point and the maximum quantity associated with the capacity of the equipment.Practical implicationsPractically, the objective of this work is first to determine the optimal strategy to be adopted by the lessor in terms of effort relating to PM and second to determine the minimum quantity of consumables that the lessee must purchase during the leasing period such as profit is insured for the lessor.Originality/valueThis type of leasing (for free) has not been addressed in the literature particularly when considering maintenance strategies.

Publisher

Emerald

Subject

Industrial and Manufacturing Engineering,Strategy and Management,Safety, Risk, Reliability and Quality

Reference23 articles.

1. Performance measurement on lease equipment with overall equipment effectiveness,2019

2. Optimal maintenance policy for equipment leased with base and extended warranty;International Journal of Production Research,2022

3. Optimal imperfect maintenance strategy for leased equipment;International Journal of Production Economics,2016

4. Optimal imperfect preventive maintenance policy for equipment leased during successive periods;International Journal of Production Research,2016

5. Optimal hybrid imperfect preventive maintenance policy for leased equipment;IFAC-papers On Line,2017

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3