Bargaining optimization model for risk renegotiation with fairness concerns in infrastructure PPP projects

Author:

Chen Canjun,Lv Lelin,Wang Zhuofu,Qiao Ran

Abstract

PurposeReasonable risk sharing is the key to the smooth implementation of infrastructure public-private partnership (PPP) projects and the optimization of benefit distribution among the participants. This study aims to explore the risk redistribution ratio between the government and the private sector under different degree of fairness concern.Design/methodology/approachRenegotiation is a mechanism to provide flexibility and make up for incompleteness of PPP contracts. However, the threshold value of risk redistribution ratio and negotiation cost are not explicitly considered in previous studies. In addition, these studies do not consider the influence of the fairness concern psychology on the negotiation process. To address these gaps, based on risk-income equilibrium analysis, this paper established the bargaining optimization model of PPP projects renegotiation considering the fairness concerns of the negotiating parties. Furthermore, this study analyzed the influence of fairness concern degree on negotiation thresholds, negotiation results, and negotiation incomes under three scenarios.FindingsThe results showed that excessive focus on the fairness of incomes may exclude the risk redistribution ratio that is most beneficial to project incomes from the negotiation threshold. Moreover, the increase in the fairness concerns of negotiating parties can reduce the negotiation success period, but the net income may not necessarily be improved.Originality/valueThe main contribution of this paper is to propose a new risk renegotiation methodology based on the risk-income equilibrium analysis, which is helpful to develop risk management strategies in the construction field. The research results can provide government with reference about renegotiation in decision making and provide theoretical support for the practice of PPP renegotiation.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference55 articles.

1. An evaluation of the impact of risk cost on risk allocation in public private partnership projects;Engineering Construction and Architectural Management,2019

2. Negotiation model of design optimization profit distribution with fairness concerns in construction projects;Ksce Journal of Civil Engineering,2018

3. Bidding for incomplete contracts: an empirical analysis of adaptation costs;American Economic Review,2014

4. Cross-sectional analysis of critical risk factors for PPP water projects in China;Journal of Infrastructure Systems,2015

5. Risk perception analysis: participation in China's water PPP market;International Journal of Project Management,2010

Cited by 7 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3