1. Ahadzie, D. K., Proverbs, D. G., and Sarkodie-Poku, I. (2014). “Competencies required of project managers at the design phase of mass house building projects.” International Journal of Project Management, vol. 32, no. 6, pp. 958–969, DOI: 10.1016/j.ijproman. 2013.10.015.
2. Bolton, P. and Dewatripont, M. (2005). “Contract theory.” MIT Press, Cambridge.
3. Brett, J. and Thompson, L. (2016). “Negotiation.” Organizational Behavior & Human Decision Processes, No.136, pp. 68–79, DOI: 10.1016/j.obhdp.2016.06.003.
4. Chow, P. T., Cheung, S. O. and Yiu, T. W. (2012). “A cusp catastrophe model of withdrawal in construction project dispute negotiation.” Automation in Construction, vol. 22, no. 4, pp. 597–604, DOI: 10.1016/j.autcon.2011.12.006.
5. Ekanayake, S. (2004). “Agency theory, national culture and management Control Systems.” Journal of American Academy of Business, vol. 6, Nos. 2–3, pp. 190–207(18), DOI: 10.4337/9780857938732.00014.