A centralised cost management system: exploiting EVM and ABC within IPD

Author:

Elghaish Faris,Abrishami Sepehr

Abstract

PurposeIntegrated project delivery (IPD) is highly recommended to be utilised with building information management (BIM), specifically with BIM level-3 implementation process. Extant literature highlights the financial management challenges facing the proposed integration. These challenges are mainly related to the IPD compensation and the conventional cost control approaches that are not consistent with IPD principles. As such, this paper presents an integration of several methods to support automating risk/reward sharing amongst project parties thus enhancing IPD core team members’ relationship.Design/methodology/approachThe literature review was used to highlight the challenges that face the IPD-based cost management practices such as the risk sharing/reward sharing amongst IPD core team members and potential methods to bridge the revealed IPD gap. A framework was developed by integrating the activity-based costing (ABC) – as a method to analyse the cost structure – and earned value management (EVM) to develop mathematical models that can determine the three main IPD financial transactions (i.e. …) fairly. To demonstrate the applicability of the developed system, a real-life case study was used, in which, promising results were collected in regard to visualising the cost control data and understanding of the accumulative status of the project cost and schedule for team members.FindingsA centralised cost management system (CCMS) for IPD is developed to enable the IPD cost structure as well as automating the risk-sharing/reward-sharing calculations. This system is linked with a web-based management system to display the output of proposed risk-sharing/reward-sharing models. Moreover, a novel grid is developed to show the project status graphically and to respect the diversity in core team members backgrounds. In addition, the case study showed that the proposed integration of different methods (ABC, EVM, BIM and web-based management system) is interoperable and applicable.Originality/valueThis research presents a comprehensive solution to the most revealed challenges in cost management practices in IPD implementation. The outcome of this research contributes to the body of knowledge through presenting new extensions of the EVM to be used with the IPD approach to calculate risk/reward. Moreover, the implementation of the proposed tools such as centralised cost management system (CCMS) and CCMS for IPD web system will enhance/foster the implementation of the IPD in conjunction with BIM process.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference64 articles.

1. Virtual generative BIM workspace for maximising AEC conceptual design innovation: a paradigm of future opportunities;Construction Innovation,2015

2. Enhancement of IPD characteristics as impelled by information and communication technology;Journal of Management in Engineering,2019

3. Status of BIM adoption and the BIM experience of cost consultants in Australia;Journal of Professional Issues in Engineering Education and Practice,2013

4. Integrated project delivery: an action guide for leaders,2018

Cited by 28 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3