Author:
Shahtaheri Maryam,Haas Carl Thomas,Salimi Tabassom
Abstract
Purpose
Good planning is key to good project performance. However, for the sub-class of round-the-clock projects requiring mixed mode planning a suitable planning approach does not exist. The purpose of this paper is to develop and validate such an approach.
Design/methodology/approach
Development of the approach builds on a synthesis and extensions of previous work related to projects with round-the-clock schedules, containing multiple workflows (sequential/cyclical). This approach considers the interdependence among shift-schedule, productivity, calendar duration, and risk registers. It quantifies the confidence in those strategies using a Monte Carlo and a multi-dimensional joint confidence limit (JCL) simulation platform.
Findings
n of workflows and their interdependencies. Also, the platform results show that the deviation between the deterministic outcomes and the simulated ones are a good indicator when dealing with projects with minimal tolerance for possible imposed mitigation strategies (e.g. round-the-clock projects).
Research limitations/implications
The validation of the approach is limited to a multi-billion dollar nuclear refurbishment case study and functional demonstration. The applicable class of projects is limited, and includes those for which failure of cost, schedule, or quality implies project failure.
Originality/value
It is anticipated that the proposed approach will assist with developing a realistic planning strategy by incorporating various factors and constraints under the impact of risks and uncertainty. This may lead to a more reliable determination of outcomes for round-the-clock projects.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference43 articles.
1. AACE International Recommended Practice No. 18R-97 Cost Terminology;AACE International,2010
2. Research in modeling and simulation for improving construction engineering operations;Journal of Construction Engineering and Management,2011
3. A systems approach to vulnerability assessment;Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management,2011
4. Risk analysis and management is construction;International Journal of Project Management,1997
5. Effects of alternating 8- and 12-hour shifts on sleep, sleepiness, physical effort and performance;Scandinavian Journal of Work, Environment and Health,1998
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献