1. Ahamad, M.H.S., Perera, B.A.K.S. and Illankoon, I.M.C.S. (2013), “In house versus outsourcing facilities management: a framework for value added selection in Sri Lankan commercial buildings”, in Senevirathne, L.D.I.P. and Sandanayake, Y.G. (Eds), Proceedings of the Second World Construction Symposium 2012 on Planning, Designing and Building for Tomorrow in Colombo, Sri Lanka, Ceylon Institute of Builders, Colombo, pp. 298-306.
2. The significance factors causing delay of building construction projects in Malaysia;Engineering, Construction and Architectural Management,2007
3. Alkass, S., Mazerolle, M. and Harris, F. (1996), “Construction delay analysis techniques”, Construction Management and Economics, Vol. 14 No. 5, pp. 375-394.
4. Arcuri, F.J., Hildreth, J.C. and Tech, V. (2007), “The principles of scheduling impact analysis”, Working Paper No. TR-07-03, Virginia Polytechnic Institute and State University, VA.
5. Selecting a delay analysis method in resolving construction claims;International Journal of Project Management,2006