Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka

Author:

Ekanayake E.M.K.,Perera B.A.K.S.

Abstract

Purpose Delays represent one of the most critical factors that affect the cost of a construction project. They have to be therefore analysed comprehensively using appropriate techniques. The purpose of this paper is to find out the delay analysis techniques (DATs) that are most commonly used in road projects in Sri Lanka, the extent of their usage, the criteria that can be used in selecting them and the technique that is most appropriate for the selection. Design/methodology/approach The research methodology adopted included an extensive literature review, expert interviews and a questionnaire survey. Findings In road projects in Sri Lanka, five types of DATs are mainly used. The “As-planned v. As-built Analysis” technique is the most commonly used technique while “Window Analysis” is the least used technique. Out of the nine criteria identified for selecting a DAT, the most important criterion is the acceptability of the technique to courts and tribunals. “Window Analysis” was found to be the most appropriate DAT that can be used in road construction projects in Sri Lanka. Originality/value “Window Analysis” can be recommended as the most appropriate DAT for road projects in Sri Lanka.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Reference50 articles.

1. Ahamad, M.H.S., Perera, B.A.K.S. and Illankoon, I.M.C.S. (2013), “In house versus outsourcing facilities management: a framework for value added selection in Sri Lankan commercial buildings”, in Senevirathne, L.D.I.P. and Sandanayake, Y.G. (Eds), Proceedings of the Second World Construction Symposium 2012 on Planning, Designing and Building for Tomorrow in Colombo, Sri Lanka, Ceylon Institute of Builders, Colombo, pp. 298-306.

2. The significance factors causing delay of building construction projects in Malaysia;Engineering, Construction and Architectural Management,2007

3. Alkass, S., Mazerolle, M. and Harris, F. (1996), “Construction delay analysis techniques”, Construction Management and Economics, Vol. 14 No. 5, pp. 375-394.

4. Arcuri, F.J., Hildreth, J.C. and Tech, V. (2007), “The principles of scheduling impact analysis”, Working Paper No. TR-07-03, Virginia Polytechnic Institute and State University, VA.

5. Selecting a delay analysis method in resolving construction claims;International Journal of Project Management,2006

Cited by 21 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3