1. An Algorithm for the Manufacturing Equipment Selection Problem
2. Koelsch, J.R. (1992), “Flexible cells and machining centers”, Manufacturing Engineering, August, pp. 27‐30.
3. Koelsch, J.R. (1994), “Drilling, milling and boring”, Manufacturing Engineering, August, pp. 65‐6, 68.
4. The production equipment requirements problem
5. Manufacturing Engineering (1992), “Cost justification software”, January, p. 104.