Significant factors affecting the New Zealand transportation infrastructure project cost – quantity surveyors' perception

Author:

Atapattu Chinthaka NiroshanORCID,Domingo NilukaORCID,Sutrisna Monty

Abstract

PurposeCost overrun is one of the critical issues faced in construction projects, as nine out of ten projects will likely go over the budget. In particular, transportation infrastructure (TI) projects, such as roads and bridges, are vastly affected by cost overruns, which can delay the entire project. This research intends to identify the factors affecting the cost overruns in New Zealand (NZ) TI projects.Design/methodology/approachThe research was conducted using a questionnaire survey involving ninety-two participants experienced in infrastructure project estimation in NZ. Quantitative methods were used to analyse the data.FindingsFifty-three factors were identified through literature under ten categories. Based on the survey, ten significant factors were identified with a high grade of importance. The three most critical factors were “frequent design changes,” “poor planning and scheduling” and “inadequate tender documentation.” It was found that the cost overrun is primarily affected by the pre-contract stage causes.Research limitations/implicationsThe data were collected from professionals involved in NZTI projects. Therefore, the implications may be different for other contexts.Practical implicationsThe results will improve the current estimation practice by developing a new statistical model considering all the significant variables for NZTI projects.Originality/valueAlthough much research is done to identify these factors, they are only considered in a few statistical cost models. These new statistical models mainly focused on technical variable factors similar to the current standard estimation process. However, the results of this research, qualitative and quantitative factors, will be used for the future cost model.

Publisher

Emerald

Subject

Civil and Structural Engineering,Building and Construction,Architecture,Engineering (miscellaneous),Urban Studies

Reference73 articles.

1. Significant factors causing cost overruns in large construction projects in Malaysia;Journal of Applied Science,2013

2. Evaluating the budgetary reliability of design stage elemental cost plan in building procurement: New Zealand study,2016

3. Aggregation of factors causing cost overruns and time delays in large public construction projects Trends and implications;Engineering, Construction and Architectural Management,2017

4. Understanding major causes cost overrun for infrastructure projects: a typology approach,2012

5. Significant factors causing cost overruns in telecommunication projects in Nigeria;Journal of Construction in Developing Countries,2010

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis;Journal of Financial Management of Property and Construction;2024-03-28

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3