What leads to the high capital cost of prefabricated construction in China: perspectives of stakeholders

Author:

Liu YuORCID,Chang Rui-Dong,Zuo JianORCID,Xiong Feng,Dong Na

Abstract

PurposePrefabricated construction (PC) will play a vital role in the transformation and upgrading of the construction industry in the future. However, high capital cost is currently one of the biggest obstacles to the application and promotion of PC in China. Clarifying the factors that affect the PC cost from the perspectives of stakeholders and exploring key cost control paths help to achieve effective cost management, but few studies have paid enough attention to this. Therefore, this research aims to explore the critical cost influencing factors (CIFs) and critical stakeholders of PC based on stakeholder theories and propose corresponding strategies for different stakeholders to reduce the cost of PC.Design/methodology/approachBased on the stakeholder theory and social network theory, literature review and two rounds of expert interviews were used to obtain the stakeholder-associated CIFs and their mutual effects, then the consistency of the data was tested. After that, social network analysis was applied to identify the critical CIFs, critical interaction and key stakeholders in PC cost control and mine the influence conduction paths between CIFs.FindingsThe results reveal that the cognition and attitude of developer and relevant standards and codes are the most critical CIFs while the government, developer and contractor are crucial to the cost control of PC. The findings further suggest that measures should be taken to reduce the transaction costs of the developer, and the contractor ought to efficiently apply information technology. Moreover, the collaborative work between designer and manufacturer can avoid unnecessary cost consumption.Originality/valueThis research combines stakeholder management and cost management in PC for the first time and explores the effective cost control paths. The research results can contribute to clarifying the key points of cost management for different stakeholders and improving the cost performance of PC projects.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Cited by 34 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3