1. Abd Shukor, A.S., Mohammad, M.F., Mahbub,R. And Ismail, F., (2011), Supply Chain Integration in Industrialised Building System in the Malaysian Construction Industry, The Built Environment Review, Vol. 4, Special Issue 1.
2. Ashworth, A., (1995). Cost Studies of Building, Second Edition, Longman Scientific and Technical, Harlow.
3. Bubshait A.A. and Al-Juwairah, Y.A. (2002), Factors Contributing to Construction Costs in Saudi Arabia, Cost Engineering, Vol. 44(5), pp. 30-34.
4. Chan, S.L. and Park M., (2005), Project Cost Estimation Using Principal Component Regression, Construction, Management & Economics, Vol. 23 (3), pp 295-304.
5. Chan, D.W.M. and Kumaraswamy,M.M. (1997). A Comparative Study of Causes of Time Overruns in Hong Kong Construction Projects, International Journal of Project Management, Vol. 15(1), pp. 55-63.