Abstract
PurposeThe exact process of construction projects performance assessment and benchmarking still remains subjective relying on qualitative techniques, which does not allow stakeholders to address the issues and the drawbacks of their respective projects as effectively as possible for performance improvement purposes. Hence, this research aims to establish a unified project performance score (PPS) for assessing and comparing projects performance.Design/methodology/approachData were collected from Construction Industry Institute (CII) members and through University of Wisconsin active research projects. Exploratory data analysis was done to investigate the calculated performance metrics and the collected data characteristics. Data were converted into six performance metrics which were used as the independent variables in creating the PPS model. Logistic regression model was developed to generate the unified PPS equation in order to explain the variables that significantly affect construction projects successful post-completion performance. The PPS model was then applied on the collected dataset to benchmark projects in terms of project delivery systems, compensation types and project types in order to showcase the PPS capabilities and possible applications.FindingsThe model revealed that construction cost and schedule growth are the most important metrics in assessing projects performance, while RFIs’ processing time and change orders per million dollars were the features with the least effect on the PPS value. The authors found that integrated project delivery (IPD) and target value (TV) projects outperformed all other project delivery and compensation types. While, industrial projects showed the worst performance, as compared to commercial or institutional projects.Originality/valueThe PPS model can be used to assess the performance of any pool of executed projects, and introducing a novel addition to the field of construction business analytics which is a supplementary tool to successful decision making and performance improvement. Additionally, the bidding selection system can be revolutionized from a cost-based to a performance based one using the PPS model to improve the outcomes of the buyout process.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference61 articles.
1. Aboseif, E. (2021), “Reaching a consensus among construction stakeholders: defining success and benchmarking performance”, Master’s thesis, Dept. Of Civil and Environmental Engineering, Univ. of Wisconsin–Madison, available at: https://minds.wisconsin.edu/handle/1793/82596
2. Aboseif, E. and Khallaf, R. (2020), “A framework for last planner system implementation in Egypt”, in Ha-Minh, C. (Ed.), CIGOS 2019, Innovation for Sustainable Infrastructure. Lecture Notes in Civil Engineering, Springer, Singapore, Vol. 54.
3. A case study performance analysis of design build and integrated project delivery methods;International Journal of Construction Education and Research,2019
4. Ahmed, H. (2011), “Analysis of building sector construction productivity trends in north America between 1995 and 2009”, UWSpace, available at: https://hdl.handle.net/10012/6057