1. AlSehaimi, A., Tzortzopoulos, P., & Koskela, L. (2009). Last Planner System: Experiences from Pilot Implementation in the Middle East. 17th Annual Conference of the International Group for Lean Construction, (pp. 53-66). Taipei, Taiwan.
2. Baladrón, C., & Alarcón, L. F. (2017). Assessing the Impact of Lean Methods in Mining Development Projects. 25th Annual Conference of the International Group, (pp.137-144). Heraklion, Greece. doi:
https://doi.org/10.24928/2017/0272
3. Bhatla, A., & Leite, F. (2012). Integration Framework of BIM with the Last Planner System. 20th Annual Conference of the International Group for Lean Construction. San Diego.
4. Issa, U. H. (2013). Implementation of Lean Construction Techniques for Minimizing the Risks Effect on Project Construction Time. Alexandria Engineering Journal, 697-704.
5. Nani, G., & Apraku, K. (2016). Effects of Reward Systems on Performance of Construction Workers in Ghana. Civil and Environmental Research, 8(7).